As a company specializing in consulting - design - construction of townhouses, villas, and factories nationwide, cooperating effectively with many growing companies under the motto: "QUALITY FIRST - COST OPTIMIZATION", we possess strong capabilities and have executed many large-scale projects. Our construction teams have been present across provinces and cities nationwide. This demonstrates that we are one of the experienced, reputable, and trustworthy companies in factory design and construction for your projects.

The demand for designing and constructing factories for production purposes is increasingly essential for businesses. Understanding this, TOAN TAM PHAT specializes in design - construction - building of pre-engineered steel factories at all scales based on different requirements such as factories, warehouses, and steel structures. From initial design, foundation work, steel column erection to integrated factory-office buildings, warehouse construction, factory construction, and steel frame fabrication and installation.

Pre-engineered steel factory design process

  • Step 1: Site survey – discuss requirements with the client at the construction location.
  • Step 2: Conceptual design of the factory, layout, and area.
  • Step 3: Technical design drawings for factory construction.

Factory construction design content

Propose design solutions, evaluate scale and layout of construction items, install steel doors, and present construction options including technology, main structure, technical systems, and infrastructure (environmental protection, fire prevention systems, standards and codes). Specialized software is applied in the factory design process.

Develop layout drawings, process diagrams, and architectural solutions for factory construction projects.

Contents of factory design drawings for pre-engineered steel buildings:

Includes design drawings, survey documents, electrostatic painted steel doors, and construction cost estimates.

Construction drawings must clearly present all technical parameters, materials, and structural details in accordance with applicable standards and regulations, ensuring sufficient conditions for implementing factory, warehouse, and steel building construction.

Core values in factory design and construction:

TOAN TAM PHAT always provides customers with cost-effective solutions, minimizing expenses while ensuring superior quality in steel factory construction.

In practice, many factors can increase construction costs, including inappropriate structural solutions or oversized structural components. Common inefficiencies occur in foundation, frame, and floor structure design.

Some areas with good soil conditions are still designed with unnecessary deep foundations such as driven piles or bored piles. In reality, weak soil foundations can cost 2–3 times more than stable soil and increase overall construction costs by about 30%. Floor structure solutions are also critical due to the large surface area of factories, requiring careful consideration between natural ground floors, pile-supported floors, asphalt concrete, or cement concrete.

As a design and construction company, we always aim to deliver maximum value to customers by balancing economic efficiency with technical quality in every project.

Important notes in factory design and construction supervision:

  • Foundation and flooring are critical components affecting quality and cost. Stable soil may not require pile reinforcement, while weak soil requires proper foundation strengthening.
  • Floor design depends on usage. Concrete thickness (10–50 cm) must suit load requirements, especially for heavy machinery.
  • After concrete finishing, floor polishing and epoxy coating are required to improve durability, cleanliness, and strength.
  • Steel columns and frames must be properly designed to avoid excess or insufficient materials. Typically, 20–32 kg of steel per m² depending on scale.
  • Skilled workmanship is essential for both steel structure assembly and civil construction.

 

To receive a detailed cost estimate for factory construction, please contact our technical department for consultation based on your specific requirements.